(Lake Wanda Lee, foreground; Ocie Dam,
background)
Michael Schrader performed the hydrologic and hydraulic
analyses of the Lakes of Rocky Ridge Ranch:
Ocie, Wanda Lee, and Ski. Based
on these analyses, Michael Schrader
designed the modifications to all three dams and spillways needed to bring them
into compliance with Missouri Dam Safety Regulations. Design elements included bridges, spillways, grading and
earthwork, and roads. As roads traverse
each of the three dams, Michael Schrader
was also responsible for specifying the complex construction phasing and
logistics necessary to complete the work in a timely basis while maintaining
access to properties on both sides of each dam.
(Floodwall on the back of the top of Wanda Lee Dam prevents overtopping.)
·
Performed HEC-1 and HEC-2
analyses of each dam and spillway structure
·
Secured construction
permits from the appropriate state agency
·
Designed all dam and
spillway modifications
·
Designed structures
over spillways
·
Established
construction sequencing and logistics
·
Estimated construction
costs and presented designs and estimates to residents
·
Wrote specifications and bid documents
·
Served as liaison
between owners and governmental agencies
(Vehicular bridge carrying the road on top of Wanda Lee Dam across the Wanda Lee spillway.)
(Road on top of Wanda Lee Dam, left, and
Wanda Lee spillway.)